◢ COBOTCOST.COM
01 / 2026 COBOT PRICING

What a cobot actually costs in 2026.

19 models, verified pricing where distributors publish it, honest quote-only flags where they don't. No vendor in this category publishes hardware list prices on its own site, so every dollar figure on this page is distributor-quoted or industry-reported. 1 live-verified, 15 industry-reported, 2 quote-only, 1 discontinued. No affiliate revenue.

SIDE A / THE COBOT

One-time capex. Eight hours, two shifts, 250 days a year.

A cheap production-class arm is around $23,000 (Universal Robots UR3e). A heavy-payload arm reaches $85,000 (Universal Robots UR20). But the arm is only a quarter to a half of the project. The rest is EOAT + integration + safety.

Turnkey multiplier: 2x to 4x the bare arm price, which is our own model and not a published figure. AMD Machines puts a complete installed cell at $75K-$200K; the arms in the table below run $23K-$85K.

SIDE B / THE HUMAN

Hourly burden. Every shift, every year, plus turnover.

BLS CES August 2026: $30.37/hr average manufacturing production wage. BLS ECEC Q2 2026 puts manufacturing total compensation at $48.62/hr, a 1.496x load on wages. Carry that load on the production wage and an operator hour costs $45.43, or $90,860 a year per full-time role.

Published payback: 12 to 24 months for most deployments, under 10 months for high-utilisation cells (AMD Machines, March 2026). Interact Analysis put average cobot RoI at 2 to 3 years, though that reading dates to April 2022.

Models tracked
19
Cheapest production arm
$23,000
BLS prod-wage Aug 2026
$30.37/hr
Turnkey multiplier (model)
2-4x
Arm prices checked
2026-09-15
Payback layer checked
2026-10-02
02 / PAYBACK CURVE

When the cobot pays for itself.

Drag the inputs. Where the two lines cross is your break-even month. The wage slider starts at $30.37/hr, the BLS CES August 2026 manufacturing production wage. Burden is 1.496x, taken from ECEC Q2 2026 manufacturing ($48.62 total compensation over $32.50 of wages). FTEs displaced is yours to set: AMD Machines puts a machine-tending cell at 0.75-1.5 FTE, assembly at 0.5-1.0.

Robot price (USD)
$45,000
Operator hourly wage
$30.37
FTEs displaced
1
Installed cell (year 0)$83,000
Implied arm multiplier1.8x
Labour displaced / yr$90,860
Payback11.0 months
030 mo60 mopayback @ 11.0 mocobot netlabour saved
03 / VENDOR INVENTORY

19 models, every figure dated.

Sorted by payload. Status pills: green live-verified (consistent distributor listing), amber industry-reported (third-party review), grey quote-only or discontinued. Productive Robotics OB7 is the only entry with a stable distributor-published list price across multiple US resellers.

Vendor / ModelPayloadReachArm price (USD)Status
ABB IRB 14000 YuMi (dual-arm)
ABB Group
0.5 kg559 mmQuotequote only
Universal Robots UR3e
Teradyne
3 kg500 mm$23,000-38,000industry reported
Franka Robotics Franka Research 3
Agile Robots (acq. 2024)
3 kg855 mmQuotequote only
Rethink Robotics Sawyer BLACK Edition
(Discontinued)
4 kg1260 mmQuotediscontinued
Universal Robots UR5e
Teradyne
5 kg850 mm$30,000-48,000industry reported
ABB GoFa CRB 15000-5
ABB Group
5 kg950 mm$35,000-45,000industry reported
Productive Robotics OB7
Productive Robotics (independent, US)
5 kg1000 mm$24,900-27,000live verified
Techman Robot TM5-700
Quanta Storage / Omron
6 kg700 mm$23,000-28,000industry reported
Productive Robotics OB7-Max 8
Productive Robotics (independent, US)
8 kg1700 mm$34,000-38,000industry reported
Doosan Robotics A0912 (A-series)
Doosan Group
9 kg1200 mm$25,000-35,000industry reported
FANUC CRX-10iA
FANUC Corp
10 kg1249 mm$40,000-52,000industry reported
ABB GoFa CRB 15000-10
ABB Group
10 kg1520 mm$45,000-55,000industry reported
Techman Robot TM12
Quanta Storage / Omron
12 kg1300 mm$32,000-38,000industry reported
Universal Robots UR10e
Teradyne
12.5 kg1300 mm$45,000-60,000industry reported
KUKA LBR iiwa 14 R820
Midea Group
14 kg820 mm$65,000-75,000industry reported
Universal Robots UR16e
Teradyne
16 kg900 mm$50,000-65,000industry reported
Universal Robots UR20
Teradyne
20 kg1750 mm$65,000-85,000industry reported
FANUC CRX-25iA
FANUC Corp
25 kg1889 mm$60,000-85,000industry reported
Doosan Robotics H2515
Doosan Group
25 kg1500 mm$60,000-75,000industry reported
04 / BILL OF MATERIALS

The arm is only the first line item.

Twelve cost categories that almost every cobot integrator quote includes. Add these to the arm price to get a real installed cost.

01
EOAT — 2-finger adaptive gripper (Robotiq 2F-85)
Robotiq puts a 2-finger adaptive gripper at "around $5k" on its own blog. A reseller guide lists the 2F-85 at $5,825 single-unit and the wider 2F-140 near $7K; Robotiq itself publishes no list price. Most-used cobot gripper on UR arms.
$5,000-7,000
02
EOAT — 3-finger adaptive gripper
No longer a current Robotiq product. This row used to read $18,000-$22,000, taken from a Robotiq article first posted in 2016; the 3-Finger Adaptive Gripper has since left Robotiq's line-up, which now runs the 2F-85, 2F-140 and Hand-E. For irregular geometry or multi-part handling, price a multi-finger unit from Schunk or OnRobot instead.
Quote
03
EOAT — vacuum / suction
Robotiq: "cheap suction cups for a couple of hundred dollars". The upper end is our own estimate for a full vacuum EOAT with venturi and part-present sensing.
$200-1,500
04
Integration / programming labour
Standard Bots puts tooling, vision and integration at $5,000-$30,000 combined. Simple pick-and-place at the low end; multi-pass welding cells at the high end.
$5,000-30,000
05
Safety scanner (SICK nanoScan3 / microScan3)
SICK sBot Stop / Speed packages typical, listed on UR+ without a price. The 3-8K per-scanner band is our own estimate, not a published figure. Two scanners often needed.
$3,000-8,000
06
Safety fencing / light curtain
Robotiq puts safety fencing at "5k+ USD"; the upper bound is our own. Often not required for true collaborative-mode ops, but added in higher-payload cells.
$5,000-10,000
07
ISO/TS 15066 safety assessment
Required for any production cobot deployment, done by the integrator or a certified third party. Our own estimate: no source we can point at publishes an assessment fee, and the guide this row used to cite does not cover it.
$2,000-8,000
08
Annual maintenance
Standard Bots: "Most cobots cost between $1,000 and $2,000 per year to maintain." Excludes priority-support contracts.
$1,000-2,000
09
Service contract (priority support)
Quoted per cell. This row used to read $4,500-$18,000 on a "10-15% of robot price per year" rule credited to Standard Bots; Standard Bots in fact puts routine maintenance at 5-10% per year, and Universal Robots does not publish UR Care pricing. Ask your distributor for the percentage.
Quote
10
Operator training / programming certification
UR Academy online is free; on-site UR Core Training 1.5-3K USD per seat. Most vendors offer free tier + paid certification.
$1,000-5,000
11
Vision system add-on (2D)
Cognex In-Sight, Keyence, Pickit-2D. Techman TM-series has vision built-in — saves this category.
$4,000-12,000
12
Vision system add-on (3D / bin picking)
Pickit-3D, Photoneo, Zivid. Includes camera plus bin-picking software licence.
$15,000-35,000
05 / PAYBACK BY APPLICATION

What you're actually using it for changes everything.

Palletizing pays back fastest; quality inspection slowest, and only when quality-escape avoidance is counted. Figures as published by AMD Machines, an automation integrator, in March 2026. Welding is left blank because that source does not cover it.

Machine tending (CNC load/unload)
14-22months payback
Installed: $90K-$150K
Displaces 0.75-1.5 FTE
Palletizing / case packing
10-18months payback
Installed: $85K-$160K
Displaces 1-1.5 FTE
Welding
Not published
Installed: not published
Not published. AMD Machines' payback scenarios do not cover welding, and the source this row previously cited is gone from the web. We would rather leave it blank than carry a number we cannot point at.
Quality inspection
18-24months payback
Installed: $100K-$200K
AMD records labour displacement as secondary here; the payback case rests on quality-escape reduction.
Assembly / dispensing
16-24months payback
Installed: $80K-$175K
Displaces 0.5-1 FTE