◢ COBOTCOST.COM
APPLICATION

Machine tending (CNC load / unload)

The cobot category's anchor application. Cell loads parts, machine cuts, cobot unloads. Operator-shift displacement is direct and measurable.

Installed cell cost
$90-$150K
Payback
14-22 mo
FTEs displaced
0.75-1.5
Leading cobots
4 models
01 / OPERATIONAL SHAPE

What this application actually is.

Machine tending is the cobot category's volume application — load a part into a CNC mill or lathe, wait for the cycle, unload, repeat. It's where Universal Robots built its installed base and where Productive Robotics' OB7 became a category alternative. The operational shape is forgiving: parts are repeatable, the machine controls cycle timing, and the cobot has clear go / no-go states. Most cells are buffered so a brief cobot fault doesn't starve the machine. That forgiveness, plus the fact that the displaced task is measurable in operator-hours, is why first-cell buyers should start here. On AMD Machines' published figures it is not the fastest payback in the category — palletizing is — but it is the most predictable.

02 / LEADING COBOTS FOR THIS APPLICATION

Which cobot fits, and why.

01Universal Robots UR5e
5 kg · 850 mm · $30,000-48,000
Volume reference for single-machine tending. URCap palletizing partners adapted for tending cells. 5 kg payload covers most CNC parts.
02Universal Robots UR10e
12.5 kg · 1300 mm · $45,000-60,000
Multi-machine tending where 5 kg isn't enough head-room for the tool changer. Larger parts (engine components, structural parts).
03Productive Robotics OB7
5 kg · 1000 mm · $24,900-27,000
Price-anchor alternative. Direct manufacturer support compresses parts cycle time. Right fit for cost-sensitive cells with simple part geometry.
04FANUC CRX-10iA
10 kg · 1249 mm · $40,000-52,000
8-year maintenance moat compounds on machine-tending applications where the cell runs continuously. Lifetime cost favours FANUC here.
03 / THE KILLER LINE ITEM

The cost most buyers underestimate.

Parts fixturing + presentation
$8,000-$35,000

Parts have to arrive at the cobot in repeatable orientation. Custom fixtures or vibratory feeders run $8-15K for simple geometry, $25-35K for complex. This is the most commonly underestimated line item — typical integrator quotes show '$12K integration' that doesn't separate this out.

04 / NO-PAYBACK FAILURE MODES

How machine tending (cnc load / unload)cells don't earn back.

!
Underestimating fixture cost
Integrators bundle fixturing into 'integration' line and buyers don't see it separately. Ask for a fixture-design quote before committing.
!
Single-machine ROI math on a multi-machine cell
If the application is one cobot servicing one CNC, the cobot is idle while the machine cuts. Payback works only if the cobot also tends a second machine, OR if the displaced operator was performing other tasks.
!
Variable part geometry without vision
Cells that try to handle multiple part types without vision usually fail within 6 months. Either commit to fixture-per-part-type or budget vision-guided pickup ($8-25K).
OTHER APPLICATIONS
Palletizing and case-packingWelding (MIG / TIG)Quality inspectionAssembly and dispensing
Source: https://amdmachines.com/blog/cobot-payback-period/ · Payback, installed cell cost and FTE displacement are transcribed from AMD Machines' published payback scenarios (March 2026) where that source covers the application. Wage anchors are BLS CES and ECEC. The line-item costs in sections 03 and 04 are our own estimates, flagged as such, not published prices. Checked 2026-10-02.